China ram Wuhan-ah a ni – A rilru a hah lutuk chuan a rilru a buai em em a, a rilru a hah lutuk chuan a rilru a buai em em bawk a.a flagship hlawhtling taka thawn chhuah a nih thu a puang thei hi lawmawm a ti hle80kV VLF (Frequency hniam tak) Voltage sang tak siamtuUnited Kingdom-a power engineering service pe chhuaktu lar tak hnenah a hlan.
He delivery hian European high-voltage testing market-a Wuhan Huayi-in nghawng a neih chhoh zel dan leh advanced diagnostic technology hmanga infrastructure rintlakna thlawp tura a inpekna a tarlang a ni.
Taming the Grid: Engvangin nge 80kV VLF hi UK Standard a nih
UK-a electrical grid-ah hian asset upa tawh leh renewable energy network chak taka tihpun a nih avangin testing solution nghet tak tak, chiang tak leh phurh theih tur a mamawh a ni. Traditional DC Hipot testing hian tunlai XLPE cable a tichhia tih hriat a ni a, makingVLF AC test a nicommissioning leh preventive maintenance atana standard tih tur (mandatory standard) a ni.
Kan80kV VLF Hipot tester a niUK client chuan long-distance cable runs capacitance sang tak nena a handle theih avangin a thlang a, international standard khauh ber ber (IEEE 400.2 pawh tel) zawm thei 0.1Hz sinusoidal waveform stable tak a pe a ni.
Engineering chu Portability leh Precision atan a ni
80kV unit an pek chhuah hian Wuhan Huayi siam thar ber a keng tel a nidigital frequency thlak danglamna technology hmanga siam a ni. UK engineering team hnehtu hlawkna pawimawh tak takte chu:
Miniaturized High-Voltage Design hmanga siam a ni: 80kV output nei mahse, system hi field-portable a la ni reng a, remote wind farm leh tight urban substation tan a tha hle.
Full Automation a ni: Button pakhat-operation hmanga ramping, timing, leh data logging hmanga automated.
Hriselna sang zawk: Integrated over-voltage leh over-current protection leh rapid response time of< 10 ms, operator himna sang ber enfiah.
Equipment supply bakah hian Wuhan Huayi hian technical documentation kimchang tak, remote operational support, leh international partner-te tan warranty program nghet tak a pe a ni. UK-in power network a tihchangtlun zel avangin Wuhan Huayi hian energy hmalam hun nghet leh nghet tak neih theihna tura HV hmanrua bik mamawh pe turin a inpeih reng a ni.
