Brazil-a transformer test bench thawn chhuah a ni.

Mar 19, 2024

Message pakhat dah la .

Transformer hi power system-a thil pawimawh tak a nih avangin himna leh hnathawh dan tur hriat chian nan uluk taka test a ngai a ni. Chutianga tih theih dan pakhat chu transformer comprehensive test bench hman hi a ni.

Transformer Comprehensive Test Bench hi testing platform versatile tak a ni a, transformer chi hrang hrang test nan hman theih a ni a, chung zingah chuan power transformer, current transformer, potential transformer leh a dangte pawh a tel. He test bench hian test hrang hrang, transformer ratio test, insulation test, winding resistance test, leh excitation current test te pawh a huam tel a ni.

Transformer Comprehensive Test Bench hi Brazil rama Transformer siamtu zinga mi hnenah thawn a ni a, a man pawh a tlawm hle. A design hi Wuhan Huayi Electric Power Technology siam a ni. 35kV transformer test nan a tha.

 

A hnuaia test items te hi a ti thei .

 

Aih.

Test thilte .

Predelivery test 1000 a ni.

Field test a ni a .

1

Transformer NO-Load hloh leh NO-Load current percentage test

√

√

2

Transformer load hloh leh short-circuit impedance test .

√

√

3

Power frequency voltage hmanga transformer hman theihna test .

√

√

4

Frequency Doubling Voltage Usstand Test chu transformer tan a ni.

√

√

5

Transformer DC do theihna Tester 1000 a awm bawk.

√

√

6

Transformer Turn Ratio Group Error Test 2019 a awm bawk.

√

√

7

Transformer insulation do theihna leh polarization index test .

√

√

 

Transformer NO-Load characteristic test (No-load hloh, NO-load current percentage rated current atanga lo chhuak);

Transformer load characteristic test(load hloh, impedance voltage percentage; temperature conversion leh full current load loss test 30% emaw a aia tam emaw chu automatic-in a ti thei a;

Ambient Temperature leh Humidity Test hnathawh dan .

 

he performance hian a hnuaia thil mamawh te hi a tlin a ni:

■Direct loop leh indirect loop chu automatic in a switch theih.

■ High-voltage current leh voltage transformer te hian secondary switching principle an hmang a.

■ct\\pt Automatic range thlak danglam theihna .

■Transformer Integrated Test Bench chu circuit pumpuiah control leh measurement monitoring kimchang tak neih theihna tur a ni.

■A tehna data chu microcomputer hmangin automatic-in a process a, a tul angin a dah/print theih bawk.

■Adopt Microcomputer Automatic Control Measuring System Test Bench leh Manual Operation Electric Control Voltage Regulation Digital Display Complementary system pahnih.

■Zero laka invenna, current laka invenna, voltage laka invenna.

■ High voltage leakage current display leh venna, 1:1 Transformer safety grounding.

. Test Station Auxiliary Facilities 1000 a awm bawk.

■Safety alarm system hmanga siam a ni.

■ System error alarm system a awm.

■stainless steel isolation fence.

■Audih theih leh hmuh theiha hlauhawm warning system .