Gas insulation substation atan hian dielectric tests hi a pawimawh chhan .

 Jul 11, 2024

 Message pakhat dah la .

 

Dielectric test hi GIS installation-a dielectric capability enfiah theih tur zawng zawng hnuaia enfiah theih a ni a, chutah chuan temporary leh transient overvoltage te pawh a tel a, chuvangin power frequency verification, lightning impulse check, switching impulse check, partial discharge verification, leh auxiliary leh control circuit-a test te a tel a ni. Table 1-ah hian dielectric test hrang hrangte thlirletna tarlan a ni. High voltage test-ah hian test equipment lian tak tak a mamawh a, chu chuan volt sang sang emaw maktaduai tam tak emaw test voltage a siam thei a ni.

 

Dielectric test 10 a awm bawk.

Power frequency test a ni a .

Lighting impulse test 1000 a ni.

Impulse test thlak dan tur .

Partial discharge test te .

Aux.& control circuit-a test-na .

Operating frequency hnuaia conditions simulating .

Atmospheric over- voltage tehna .

Assessing over-Voltages avanga switching operations .

Design leh solid insulation chu partial discharge awm lohna tura testing .

AUX insulation a awm leh awm loh enfiah. &Control circuit te hian dielectric dinhmun an tuar thei a ni.

Primary hmanrua .

Secondary hmanrua .

 

Dielectric hmanga finfiah a ni .

Dielectric verifications te hi mechanical routine testing zawhah tihfel a ni a, GIS installation-a dielectric performance a lantir a, installation dik tak a awm theih nan, dielectric point of view atanga parts siam chiang tak tak leh particle leh pollutants awm lohna te a ni. Routine verification atan chuan dielectric test hi powerfrequency a ni a, voltage verification a nei thei bawk. Impulse verification, lighting leh switching impulse te hi routine testing-ah chuan a tel tlangpui lo. At minimum functionalsf6 pressure, a hnuaia thil awmdan hi finfiah a ni: Phase-to-Earth, phase{6}}to-phase (enclosure arrangement pakhata phase pathum awmnaah), leh open switching elements across. Hlawhtling taka one{{9}Minute withstand level disruptive discharge nei lo chu test chu hlawhtling taka tihfel a nih thu mark tur ber a ni. Thil awm thei leh siam chhuah theih lohte hmuchhuak turin, dielectric routine verification-ah pawh partial discharge testing neih a ni bawk.