Power transformer test dan pangngai chu eng nge ni?

 Aug 15, 2024

 Message pakhat dah la .

 

Transformer tehna hmanga proceding hmain test engineer chuan Section 2-a safety rules a hre chiang ang a, heng dante hi test procedure zawng zawng atan zawm vek tur a ni. A hnuaia mi hi transformer testing atana approximate sequence a ni:
1. Transformer leh parts te chu a thawn chhuah chhiatna leh a tui leh a tui te enfiah thin ang che.
2. Nameplate leh print te chu voltage dik tak leh line emaw bus emaw a external phasing connection awm leh awm loh enfiah thin ang che.
3. Thermal gauges leh hot-spot heater, bridge RTDs leh a kaihhnawih alarm contact zawng zawngte calibration enfiah rawh. Contact settings chu a hnuaia mi ang hian a inang tur a ni:
 Stage pakhat chu a kal fo thin (forced cooling) .
 2nd stage 80℃ah a awm thei ang.
 3rd stage a ni a, 90℃a ni.
 Hot-Spot Alarm 100℃(a hman theih hunah 110 degree-a trip)
 Top-oil alarm 80℃chu 55℃a sang a, 75℃chu 65℃a sang a ni.
 OA=Fan leh pump awm lo .
 FA =Fans running .
 FOA=Fans leh pump kal lai
4. Wiring point to point zawng zawng enfiah leh megger: Fans, pump, alarm, heater, tap changers, leh transformer leh interconnecting cable-a device dang zawng zawng
5. Bank 150 mVA aia sang zawng zawng chu vacuum dried vek tur a ni. Vacuum drying process laiin winding-ah test voltage hmang suh. Oil circulation laiin terminal te chu short leh grounded a nih ngei ngei tur a ni a, a chhan chu winding-a static charge tam tak a awm theih avangin.
6. Tank chu oil-a khat a nih hnuah, oil sample chu chemical lab-ah thawn a nih thu leh a result chu bank test report-ah a lut tih finfiah rawh. Filling zawh hunah oil level leh temperature chu chhinchhiah rawh.
7. POWER PUMPS leh fans te rotation dik tak leh Under Load (UL) tap Changer, pek a nih chuan a hnathawh dan dik leh a hnathawh dan dik leh dik loh enfiah turin power operate. Tin, heater, alarm leh device dang zawng zawng te pawh a hman dan tur dik leh dik loh enfiah bawk ang che.
12. Following are the winding tests to be performed:  Ratio and Polarity (Voltage Method or TTR). The preference is that all large power Transformers (>1 MVA) chu TTR test set hmangin test tur a ni.
 Impedance .
 DC winding do theihna .
 Megger leh power factor windings, bushing, leh arrestor te. Note: Power factor testing atan oil filling zawh hnu darkar 24 chhung nghak rawh.
13. CT circuit zawng zawngah load la, polarity atan flash rawh.
14. Energization hmain trip-Bank protection scheme te enfiah la, gas collection relay chu gas awm lo turin enfiah thin ang che.
15. Bank chakna pek emaw, load i lak emaw hian bank current leh voltage te chu enfiah la, UL tap-changer operation pawh a tel.
16. Check the proper phasing and voltage of the bank to the system before the load is picked up. When possible, large transformers (>1 MVA) chuan bungrua phurh hmain darkar riat chhung chakna a nei tur a ni.
17. Meter leh relay-a service check-naah{{1} siam rawh.
18. Operations-ah chhuahtir a, energization information chu TNE office-ah report.
19. Revised prints leh test report te chu turn in la, chutah chuan a hnuaia mi te hi a tel tur a ni:
 Test data zawng zawng .
 Moisture leh oil data .
 Harsatna .
 In-Service data .
 Hun hman chakna leh hnathawh theihna tura chhuah .
 Nakin lawka hmanrua test-na atana information-in harsatna danglam tak a neih chuan .