VLF Tester hman dan .

 Mar 14, 2025

 Message pakhat dah la .

 

Personnel leh equipment te himna tur enfiah la, engineer te chuan VLF tester chu dik takin an hmang tur a ni a, test result dik tak an hmu tur a ni.

Test kalphung chungchangah chuan a hnuaia step te hi kan zawm a ngai a ni.

1. Inbuatsaihna: Device chu him taka power off leh ground a nih leh nih loh enfiah la, test voltage leh frequency dik tak thlang rawh.
2. Voltage apply: Zawi zawiin ultra- hniam frequency voltage chu preset value-ah tihpun la, hun engemaw chen chu maintain rawh.
3. Monitoring Results: Current, voltage waveform, emaw partial discharge signal emaw thlirletin insulation state chu teh rawh.

Khawngaihin a hnuaia mi te hi ngaihven ve teh u.
Test voltage chu overvoltage tihchhiat loh nan device rated voltage leh insulation level angin uluk taka thlan tur a ni.
Electric shock emaw hmanrua a chhiat loh nan test laiin safety operation kalphung khauh taka zawm tur a ni.

test dan dang nena khaikhin dan inang lo;

DC High Voltage Test nena khaikhin chuan: VLF test hian a hnathawh dan tak tak chu a simulate thei a, DC test avanga insulation damage awm thei chu a veng thei bawk.
Power frequency testing nen khaikhin chuan VLF test hi field operation atan a tha zawk a, hmanraw tlem zawk a ngai bawk.
Insulation detection technology hmasawn tak a nih angin VLF testing hi power hmanrua enkawlna leh fault venna kawngah a hlu hle a ni. VLF testing kalpui fo a nih chuan equipment life chu a tha thei ang bera tihtawp theih a ni a, operational risk pawh tihtlem theih a ni bawk.

Inquiry thawn rawh .
Inquiry thawn rawh .