Power transformer visual inspection tih dan .

 Nov 11, 2024

 Message pakhat dah la .

 

Electrical test neih hmain transformer chu a hnuaia point hrang hrangte ngaihven bik turin visual check neih hmasak phawt tur a ni .
• Thil hmanrua leh cable te chu a chhe lo .
• Cable gland/sealing tawp dik taka kalpui dan tur dik tak .
• Firm cable termination/terminal connection leh ferrule .
• Drawing pawm tawh angin a dik leh dik loh Name Plate data enfiah rawh .
• Component zawng zawng install vek a nih leh nih loh enfiah rawh .
• Thil chhia a awm leh awm loh, oil leak, chhia .
• Grounding zawng zawng chu him taka connect vek a nih leh nih loh enfiah rawh "A tlem berah point hnih .
• Buchholz Relay tan piping a awm leh awm loh enfiah rawh slope leh direction dik tak conservator lam
• Buchholz relay-a inlet &outlet valve te chu a inhawng em tih enfiah rawh
• OLTC protective relay atana valve te chu a inhawng em tih enfiah rawh .
• Main tank leh radiator inkar valve zawng zawng a inhawng vek em tih enfiah .
• Silica gel rawng leh a tam dan chu breather leh oil pot level ah enfiah rawh .
• High & low voltage bushing pahnih labeling enfiah .
• AUX zawng zawng labeling check vek tur. Device leh cable te chu drawing angin .
• AUX zawng zawng install dan dik leh dik loh enfiah thin ang che. Devices 1.1.
• Conservator leh bushing-a oil level enfiah.
• Wiring zawng zawng a tight em tih enfiah rawh .
• Gas monitoring unit "Calisto" , sample valve te dah a nih leh nih loh enfiah rawh
• ON LOAD CHEY CHECK CHU CHECK CHU TAP CHU CHANGER CHU .
• Impact recorder atanga records te chu transformer chu 1000 atan a dinhmun a awm veleh enfiah tur a ni.
Transportation chhunga thil danglam lo awm apiang, recorder chu electronic a nih chuan stored data .
Analysis atan vendor hnenah thawn tur a ni (hei hi erection activity-a tel a ni)
• Bolted connection zawng zawng tightness chu a siamtu angin check leh torque tur a ni.
Recommendation (hei hi erection activity-a tel a ni)
• A kianga lei lai hmun hrang hranga nung part-te chu horizontal leh vertical clearance a awm tur a ni.
leh standard-a confirm (hei hi erection activity-a tel a ni)
• Bushing leh neutral CTs te chu connection a chhiat leh chhiat loh enfiah tur a ni .