GIS tan PD test tih dan .

 Mar 10, 2025

 Message pakhat dah la .

 

GIS (GAS-insulated switchgear) partial discharge test hi a insulation performance endikna atana hmanraw pawimawh tak a ni a, chu chuan hmanruaa chhiatna awm thei te chu a tha zawngin a hmu thei a ni. A hnuaia tarlan te hi GIS partial discharge test atana hmalakna tur leh fimkhur dan tur chipchiar tak takte chu a ni.

I. Test neih chhan .
GIS-a partial discharge detect la, device him taka hman theih nan insulation system hriselna endik rawh.

Pahnihnaah chuan test hmanrua .
Partial discharge detector: Partial discharge signal tehna leh record nan hman thin.
High Voltage Test Transformer: Test atana mamawh voltage sang tak a pe.
Coupling capacitor hmangin partial discharge signal an thawn chhuak thin.
Calibration Pulse Generator: Partial discharge detection system calibrate nan hman thin a ni.
Shielded chamber emaw shielded cables: pawn lam electromagnetic interference tihtlem.
3. Test dan tur .
Inbuatsaihna hnathawh .
GIS device a lan dan tur chu enfiah rawh.
Test area himna chu nemnghet la, warning sign siam rawh.
Wiring a dik leh a nghet em tih enfiah turin test equipment te chu connect rawh.
Calibration system hmanga siam a ni.
Calibration pulse generator hmang hian partial discharge detection system chu calibrate a ni a, chu chuan measurement dik tak a tichiang a ni.
Voltage hman tur a ni.
Zawi zawiin test value-ah voltage tihpun (a tlangpuiin GIS-a rated voltage aiin a let 1.1 atanga 1.2-in) tihpun a ni.
Test voltage chu a nghet reng a, partial discharge signal chu en rawh.
Detection leh Recording .
Partial discharge detector hmang hian signal an khawl khawm a, discharge quantity leh discharge frequency ang chi parameter an record thin.
Partial discharge a awm leh awm loh hriat nan signal characteristics te chu thlirlet rawh.

Test chu tihtawp rawh .
Zawi zawiin voltage chu zero-ah tihhniam la, test power supply chu titawp rawh.
Test data leh issue test report te chu collate rawh.

4. Fimkhur tur .
Environment mamawh: Test environment chu a vawt tur a ni a, electromagnetic interference chak tak a awm loh tur a ni.
Safety Protection: Operator-te chuan insulation hmanrua an ha tur a ni a, non-related personnel-te chuan test area-ah an lut tur a ni lo.
Equipment Inspection: Test hmain hmanrua chu a dinhmun a tha a, wiring pawh a dik em tih enfiah tur a ni.
Data Analysis: Equipment Operation History nen a inzawm chuan rorel dik lo awm lo turin test results te thlirletna kimchang tak neih a ngai a ni.
5. Test result endik dan .
Normal conditions: Local discharge capacity chu standard limit aiin a hniam a, discharge signal langsar tak a awm lo.
Thil awmdan pangngai lo: Local discharge capacity hian standard a pel a, a nih loh leh signal pangngai lo a awm bawk. Device a insulation status enfiah tur a ni.
A chunga step hrang hrang hmang hian GIS partial discharge test chu dik taka tihfel theih a ni a, chu chuan hmanrua him taka hman theihna tur rintlak tak a pe a ni.