MV leh LV switchgear room testing tih dan tur .

 Nov 14, 2024

 Message pakhat dah la .

 

MV leh LV switchgear te hi electrical distribution system eng pawha thil pawimawh tak an ni. Heng switchgear te hian system rintlak leh himna tur atan parameter bik chhungah an thawk tha em tih enfiah a pawimawh hle.Switchgear testing hi regular interval ah tih a ni a, hei hi a thleng thei a ni. Test-naah hian parameter hrang hrang, insulation resistance, contact resistance, mechanical operations, leh voltage withstand test te a tel a ni.

Circuit breaker test neih zawh hnuah:
1. Hmuh theiha enfiahna: hmanrua integrity a enfiah a, hlauhawm awm thei te a hriat theih bakah installation dikzia a finfiah bawk.
2. Insulation Resistance Testing: Insulation quality a dik leh dik loh a enfiah a, moisture/pollution a hmuchhuak a, electric shock a veng thei bawk.
3. Contact Resistance Testing: Connection rintlak a awm theih nan a enkawl a, power hloh a ti tlem a, a lum lutuk tur a veng bawk.
4. Operation Timing Testing: Switching operation dik tak a dik tih a nemnghet a, synchronization a awm theih nan a enkawl a, a thawk tha lo tur a veng bawk.
5. HI-POT testing: Electrical insulation chakna a nemnghet a, chak lohna a hmuchhuak a, personnel te himna a tichiang bawk.


Heng test kimchang tak takte hian:
- Electric hmanga himna .
- power transmission rintlak tak a ni.
- downtime tih tlem a ni.
- a thawk tha thei ang bera hman theih a ni.
- Industry standard zawm .

Electrical distribution system rintlak leh him leh him loh enfiah nan MV leh LV switchgear test hi a pawimawh hle. Test neih fo hian fault eng pawh chu a chhiat emaw, a hliam emaw a thlen hmain a hriat theih a, a siamthat theih bawk. Hei hian system chu safety standard leh regulations zawm turin a tichiang a ni.

Inquiry thawn rawh .