CT test & CT secondary injection test hi CT primary injection test hmain tihfel tur a ni. Tunah chuan CT secondary circuit zawng zawng hi verified vek a nih kan ring tawh a, chuvangin, primary side-ah primary current injection kit eng pawh hmangin high current kan inject thei a ni. Mahse injection hmain mechanical check & visual inspection kan kal a ngai a, chu chu:
Visual inspection .
I. Taksa chhiatna a awm lo .
II a ni. Drawing pawm tawh angin connection te .
iii a ni. Ferrules a ni a, a tha hle mai.
iv. Tightness zawng zawng Connection zawng zawng OK .
V. High High-impedance relay zawng zawng isolate vek rawh.
VI. Relay zawng zawng chu ‘out of service position’ ah dah vek la, chu chuan false trip a awm loh nan .
Step pathum process .
I. Core hriat theihna .
II a ni. Secondary connection atana hman tur short/isolation facility atana hman mek ratio & confirmation
iii a ni. Bus bar a nghet & sensitivity .
primary injection a ni.
Primary injection lai hian a chunga kan sawi tak- hian input current magnitude hrang hrangah step pathum kan sawi a ngai a. Core identification atan chuan primary rates hniam ber current hniam ber 20% & short all protection & metering core pakhat hnu pakhat. Shorted core secondary current chu zero a nih ngei ngei tur a ni.
Chutiang bawkin shorting leh isolation bakah CT ratio confirmation inject 40% & inject chu step hnih a ni.
1. Phase to ground .
2. Phase atanga Phase .
Step 1-ah chuan phase zawng zawngah ground lam hawiin pakhat hnu pakhatin inject la, current chu injected phase leh neutral-a magnitude dik tak nei chauha awm tur a ni tih enfiah rawh. Step 2-ah chuan phase to phase-ah combination awm thei zawng zawng nen inject la, neutral current chu zero a nih leh nih loh enfiah rawh. Terminal zawng zawng, test switch, relay, BCU’s, IED’s & Meters-a current chu teh la, chutah chuan device display atanga current chu teh rawh (terminal hmasa ber atanga device display-ah CT adopted ratio chu verify rawh.
Mahse, stability leh sensitivity atan chuan primary rated current sang ber 10% inject a ni. Injection pangngaiah chuan busbar protection display-a differential current magnitude chu zero a ni tur a ni a mahse secondary connection chu jumper hmanga kan reverse emaw swap emaw chuan tunah chuan protection relay-ah differential current kan hmu ang.
Thil chhinchhiah:
• Primary injection lai hian CT test mek atanga thawm a awm loh nan enfiah thin ang che.
• Circuit zawng zawng chu normalize vek rawh .
• CT pakhat aia tam a tel a nih chuan primary injected current chu minimum primary rated current-ah tihkhawtlai tur a ni.