Test lai hian spark lian tak ka hmu a, relay chu a trip ta a. Flashover nge breakdown - a ni em a, engtin nge a danglamna ka hriat theih ang?
Flashover (external surface discharge) leh breakdown (internal puncture) thliar hran hi a pawimawh hle a, a chhan chu corrective action hi a danglam vek a ni.
Thuhmahruai (IEC 60060-1):
• Flashover: Insulator SURFACE atanga discharge (pawn lam - insulation chu a la awm reng thei).
• Breakdown / Puncture: Solid emaw liquid emaw insulation hmanga paih chhuah (internal - permanent damage).
|
Hmuhdan |
Flashover (Pawn lam atanga chhuak) . |
Inthenna (Internal) 1.1. |
|
Discharge kawng hmuh theih |
Bushing surface emaw air gap emaw zawh zawng zawngah |
Insulation hmangin - chu a lang lo mai thei |
|
Ri |
"Crack" ri nasa tak, nalh tak (air ionization) . |
Duller "thump" (oil/paper hmanga) . |
|
Arc awmna hmun a ni |
Live terminal leh lei inkar ah hmuh tur a awm |
Chhunglam; surface path hmuh tur a awm lo |
|
Post-test IR |
Normal (insulation a awm lo) . |
A tlahniam nasa hle (compromised) . |
|
Post-test Tanδ tih a ni |
Normal emaw, a sang deuh emaw |
Dramatic takin a pung ta a ni |
|
Post-test DGA tih a ni |
Hrilhfiahna a awm lo |
C2H2, H2 chu oil hmanga puncture arcs a nih chuan |
Thutlukna siamna thing:
1. Discharge path chu lei chung lamah a lang em?
→ YES=flashover → fai, vawt, re-test.
→ NO=hi chhungril lam a ni thei. IR → a hniam=breakdown a nih chuan teh rawh.
2. Discharge chu voltage inangah a repetitive em?
→ YES=chhungril lama chhiatna (a awm leh ang).
→ NO=random surface flashover (contamination) a awm lo.
Practical rule pawimawh tak:
• Flashover hi test setup failure a ni a, equipment failure a ni lo.
• Internal breakdown IS hmanrua chhia - siamthat emaw thlak emaw a ni.
• Document fo thin: discharge laiin voltage, khaw lum leh khaw vawt, lei chung bawlhhlawh.