Loss tehna atanga transformer efficiency hi engtin nge chhut a nih

 May 19, 2026

 Message pakhat dah la .

 

Q: Test atanga P₀ leh Pₖ pek a nih chuan engtin nge load level hrang hrangah efficiency ka chhut ang?

 

A: Efficiency η=P_out / (P_out + P₀ + 2 × Pₖ) × 100%, chutah chuan=load factor.

Entirnan: 10 MVA transformer, P₀=12 kW, Pₖ=85 kW: a ni.

Ritphur

A chhuahna (kW) 1.1.

P2 (kW) a ni.

2×Pₖ (kW) a ni.

η (%)

25%

0.25

2,500

12

5.3

99.31

50%

0.50

5,000

12

21.3

99.34

75%

0.75

7,500

12

47.8

99.21

100%

1.00

10,000

12

85.0

99.04

120%

1.20

12,000

12

122.4

98.89

= √(P₀ / Pₖ)=0.376 → ~37.6% load-ah efficiency sang ber.

Energy hman tangkai dan tur tehfung:

• IEC 60076-20: EEI class A (a sang ber) → D.

• EU Ecodesign 2019/1783: Tier 2 (2021), Tier 3 (2025–27) a ni a, a hlawhtlinna hi a ropui hle.

• DOE 10 CFR Part 431: dan thar June 2026 atanga hman tan a ni.

• GB 20052-2020 (China): Pawl 1 (a sang ber) → 3.

• IS 1180 (India): BEE Star Rating 1–5 a ni.

TCO kalphung: TCO=Hman man + A × P₀ + B × Pₖ

A ≈ $3,000–8,000/kW (load capitalized cost awm lo-).

B ≈ $500–2,000/kW (load capitalized man) a ni.