Q: Test atanga P₀ leh Pₖ pek a nih chuan engtin nge load level hrang hrangah efficiency ka chhut ang?
A: Efficiency η=P_out / (P_out + P₀ + 2 × Pₖ) × 100%, chutah chuan=load factor.
Entirnan: 10 MVA transformer, P₀=12 kW, Pₖ=85 kW: a ni.
|
Ritphur |
|
A chhuahna (kW) 1.1. |
P2 (kW) a ni. |
2×Pₖ (kW) a ni. |
η (%) |
|
25% |
0.25 |
2,500 |
12 |
5.3 |
99.31 |
|
50% |
0.50 |
5,000 |
12 |
21.3 |
99.34 |
|
75% |
0.75 |
7,500 |
12 |
47.8 |
99.21 |
|
100% |
1.00 |
10,000 |
12 |
85.0 |
99.04 |
|
120% |
1.20 |
12,000 |
12 |
122.4 |
98.89 |
= √(P₀ / Pₖ)=0.376 → ~37.6% load-ah efficiency sang ber.
Energy hman tangkai dan tur tehfung:
• IEC 60076-20: EEI class A (a sang ber) → D.
• EU Ecodesign 2019/1783: Tier 2 (2021), Tier 3 (2025–27) a ni a, a hlawhtlinna hi a ropui hle.
• DOE 10 CFR Part 431: dan thar June 2026 atanga hman tan a ni.
• GB 20052-2020 (China): Pawl 1 (a sang ber) → 3.
• IS 1180 (India): BEE Star Rating 1–5 a ni.
TCO kalphung: TCO=Hman man + A × P₀ + B × Pₖ
A ≈ $3,000–8,000/kW (load capitalized cost awm lo-).
B ≈ $500–2,000/kW (load capitalized man) a ni.