CT ratio test hi primary injection/ phase angle error a ni.

 Sep 03, 2024

 Message pakhat dah la .

 

CT ratio test, current transformer test tia hriat bawk hi power system-a hman mek transformer hman mekte dikna tehna leh tihdikna atana thil pawimawh tak a ni. Current transformers (CTs) hi power system-a current level sang tak takte chu instrument leh relay tehna atana hman tur value proportionally lower-a chantir turin an hmang tlangpui thin.

CT ratio hian transformer pakhat input current leh output current inzawmna a sawifiah a, tehna dik tak neih theihna tura parameter pawimawh tak a ni. CT ratio test chhung hian transformer turns ratio chu an finfiah a, hei hian instrument output current chu primary current nena inmil a nih leh nih loh a tichiang a ni.

• Current ratio test chu primary circuit-a current inject-in secondary-a current chu primary injection test set hmangin a hnuaia schematic diagram ang hian teh theih a ni.
• CT ratio chu CT primary-a current pangngai hnaih ang zat zat inject-in CT ratio chu enfiah la, a inmil secondary current chu teh rawh.
• Test hi core leh phase tin atan pakhat zel tih tur a ni.
Primary leh secondary current tehna atan precision clamp meter leh ammeter hmang la.

CT ratio test chhung hian thil engemaw zat chuan tehna result dik tak a nghawng thei a, chu chu temperature, frequency leh transformer-a turn awm zat te hi a ni. Chuvangin, result dik leh rintlak tak hmuh theih nan a tul ang ang zawm a pawimawh hle.

 
Phase angle a awm lo .
Phase angle hi a chunga figure-a kan hmuh ang hian CPC100 hmangin teh theih a ni a, phase angle chu CT kal tlanga primary current leh secondary current inkara relay 1000 inkar angle tehna a ni.
• He test hi CT-a primary-a current inject-na hmangin tih theih a ni bawk a, relay-a primary leh secondary current luang lut inkar angle chu teh a ni.
 