Test laiin Pop sound — automatic failure a ni em?

 Jul 02, 2026

 Message pakhat dah la .

 

Q: 90% voltage-ah kan awm a, tank chhungah "Snap" (flashover) na tak ri kan hre ta. System chu a trip ta a. Tunah hian GIS hi hawn a, kan siam that a ngai em?

A: A ni hauh lo. Hei hi Self-Clearing Flashover an ti a.

"Three-Strike" tih dan (IEEE/IEC):

1. Strike 1: Flashover a awm chuan system chu discharge la, test chu restart rawh.

2. Enfiahna: Flashover pahnihna chu a hmasa aiin Voltage sang zawka a awm chuan electric chuan burr te tak te, hrual emaw, particle emaw a "burn off" tihna a ni. GIS hi a thianghlim chho zel a ni.

3. Strike 2/3: Flashover hi Same emaw Lower Voltage emaw a thleng a nih chuan harsatna tak tak (insulator cracked emaw structural defect lian tak emaw) i nei a ni. Test chu STOP nghal rawh.

Thutlukna: Flashover vawi khat a hnua minute 1 chhung full voltage-a hlawhtling taka hold chu IEC 62271-203 angin pawm theih a ni tlangpui.

Engtin nge "on-site" test atan test voltage hi kan thlan ang?

Q: Ka GIS hi 220 kV a ni. Factory-in an Type Test-a an hman voltage ang chiah khan ka test tur em ni?

A: NI LO. Field test voltages hi a hniam zawk a, chu chu "Over-stress" hmanrua, thawn chhuah leh enkawl tawhte awm loh nan a ni.

"80% Rule" tih chu:

1. Factory Test: GIS hi siamtu hnenah standard withstand level 100%-ah (eg, 220 kV system tan 460 kV) test a ni.

2. Field Test: Factory test voltage 80% (eg, 368 kV) kan hmang tlangpui.

3. Hun chhung: A tlangpuiin 80% level-ah minute 1 vel a ni.

Engvangin nge 80%? Balance a ni. Assembly error emaw transport damage emaw hmuh theihna tur khawpa sang a ni a, mahse a hniam tawk a, a famkim lohna tenau a awm chuan insulators te chu permanent aging a thlen lo ang.